Excavation, transportation, and off-site disposal of Hazardous Tier 3 lead Soil and Non-Hazardous soil.
Treated & Disposed: 6,600 Tons of Hazardous & Non-Hazardous Soil
PPE: Decontamination Station, Fit Tested Respiratory Protection, Tyvek Suits, Chemical Resistant Boots, Impervious Gloves, Protective Eyewarer, Pre & Post Blood Draw